Case Study

North Battleford Radio Station

Saskatchewan, Canada

28.4

FINANCIAL SAVING

$444 (USD)

CO2 SAVING

9,020 lbs

The performance of EndoTherm was piloted by The Jim Pattison Group at North Battleford Radio Station in Saskatchewan, Canada.

The radio station is heated by 2 x Teledyne LAARs 180,000BTU/hr output boilers. Initially the system was flushed to remove excess suspended solids before EndoTherm was added on December 13th 2017. Significant savings were expected as flushing alone can account for between 5-10% of improved performance.

A baseline was established using the IPMVP (International Protocol for Measurement & Verification of Performance) by comparing Actual Meter Readings, taken on monthly intervals with Heating Degree Days data from North Battleford/Hamlin Airport at a baseload of 18.5°C.

 

Results

Time Period Predicted Consumption (m3) Actual Consumption (m3) Difference (m3) CUSUM (m3)
1st Dec 17 – 18th Jan 18 2,988.99 2,265.33 723.66 723.66
19th Jan 18 – 15th Feb 18 2,431.22 1,847.53 583.68 1,307.35
16th Feb 18 – 16th Mar 18 2,222.88 1,359.2 863.68 2,171.02

 

Savings

Compensated Saving:

12.93%

Total Cash Saving:

$444 (USD)

Total CO2 Saving:

9,020 lbs

 

Contact Us

Permission to contact:

BEIC September 2019 Newsletter. EndoTherm success at the University of the Fraser Valley

Following the publishing of the EndoTherm case study at Vancouver Airport (click here) on the Building Energy Innovators Council (BEIC)'s website. The success of EndoTherm at the...

Case Study Spotlight: 850 King St – Grand River Hospital

Following last weeks spotlight at 200 Rue Montcalm (for more info click here); the first heat pump pilot in North America and first commercial pilot in Quebec, we have the pleasure of...

Building Energy Innovators Council (BEIC) re-publishes EndoTherm pilot at Vancouver International Airport

The Building Energy Innovators Council (BEIC) have recently re-published the case study of EndoTherm Pace Chemicals ran at Vancouver Airport. The BEIC was founded in 2016 by a diverse...

Case Study Spotlight: Multivesco

This weeks case study spotlight focuses on the recent success of real estate development company; Multivesco. The proof of concept EndoTherm pilot, run at their head office (200 Rue...

Adey Confirm Compatibility between EndoTherm and MC1 Protector Range

EndoTherm has today confirmed compatibility with Adey's leading line of corrosion inhibitors MC1 Protector and MC1+ Protector. This follows similar approvals from Sentinel and...