Case Study

St Joseph Mercy Hospital
Education Centre and Building 5305

Ann Arbor, Michigan. USA

10.43

FINANCIAL SAVING

$1,683 (USD)

CO2 SAVING

28,160 Lbs

The performance of EndoTherm was piloted by St Joseph Mercy Hospital in Ann Arbor (SJMAA) at the Education Center and Building 5305. The buildings are heated by two separate boiler systems on the same meter.

Historical data was collected for the site using a combination of monthly bills dating back to January 2015 and since April 2017, 7-day interval meter readings. Summer data has been removed as the heating is not utilized. The baseline is normalized using Heating Degree Day Data from Ann Arbor Municipal Airport.

The historical trendline is used to predict consumption based on the known HDD values for the post-EndoTherm period.

EndoTherm St Joseph Mercy Hospital Regression Graph

 

Savings

Compensated Saving:

10.43%

Total Cash Saving:

$1,683 (USD)

Total CO2 Saving:

28,160 Lbs

Excluding summer usage, the site was tested over 28 ‘winter weeks’ with 25 of them showing consumption below the baseline. The predicted consumption for the 28 weeks (from the trendline) was 23,037.05 CCF. The site actually used 20,632 CCF giving a total saving of 2,405.05 CCF.

This is a financial saving of $1,683.53 based on a unit price of $0.7/CCF and a total CO2e saving of 28,160lbs.

 

 

Contact Us

Permission to contact:

BEIC September 2019 Newsletter. EndoTherm success at the University of the Fraser Valley

Following the publishing of the EndoTherm case study at Vancouver Airport (click here) on the Building Energy Innovators Council (BEIC)'s website. The success of EndoTherm at the...

Case Study Spotlight: 850 King St – Grand River Hospital

Following last weeks spotlight at 200 Rue Montcalm (for more info click here); the first heat pump pilot in North America and first commercial pilot in Quebec, we have the pleasure of...

Building Energy Innovators Council (BEIC) re-publishes EndoTherm pilot at Vancouver International Airport

The Building Energy Innovators Council (BEIC) have recently re-published the case study of EndoTherm Pace Chemicals ran at Vancouver Airport. The BEIC was founded in 2016 by a diverse...

Case Study Spotlight: Multivesco

This weeks case study spotlight focuses on the recent success of real estate development company; Multivesco. The proof of concept EndoTherm pilot, run at their head office (200 Rue...

Adey Confirm Compatibility between EndoTherm and MC1 Protector Range

EndoTherm has today confirmed compatibility with Adey's leading line of corrosion inhibitors MC1 Protector and MC1+ Protector. This follows similar approvals from Sentinel and...