Case Study

Vancouver International Airport (YVR)
South Terminal

Vancouver, BC. Canada

17.32

FINANCIAL SAVING

$1,684 (CAD)

CO2 SAVING

10,000 kg

The performance of EndoTherm has been piloted by Vancouver International Airport (YVR) at the South Terminal.

The South Terminal services local flights and corporate charters and is heated by a 1,500mBtu Cleaver Brooks boiler.

With several years of monthly readings available the trial was based on guidance taken from the International Protocol for Measurement & Verification of Performance (IPMVP). A baseline consumption was calculated using Heating Degree Days (HDD) from the onsite weather station (baseload 18.5°C). Based on this historical data’s trend line a predicted usage was calculated each month and compared with the actual consumption.

EndoTherm Vancouver International Airport (YVR) South Terminal Regression Graph

Results

Time Period Predicted Usage (GJ) Actual Usage (GJ) Saving (GJ) CUSUM
Dec 2017 427.97 359.40 68.57 68.57
Jan 2018 325.16 294.20 57.96 126.53
Feb 2018 364.04 292.40 71.64 198.17
TOTAL 1,144.17 946 198.17  

The difference between predicted and actual consumption can be seen as a change in performance due to the introduction of the energy saving technology, EndoTherm.

 

Savings

Compensated Saving:

17.32%

Total Cash Saving:

$1,684 (CAD)

Total CO2 Saving:

10,000 kg

 

 

Contact Us

Permission to contact:

BEIC September 2019 Newsletter. EndoTherm success at the University of the Fraser Valley

Following the publishing of the EndoTherm case study at Vancouver Airport (click here) on the Building Energy Innovators Council (BEIC)'s website. The success of EndoTherm at the...

Case Study Spotlight: 850 King St – Grand River Hospital

Following last weeks spotlight at 200 Rue Montcalm (for more info click here); the first heat pump pilot in North America and first commercial pilot in Quebec, we have the pleasure of...

Building Energy Innovators Council (BEIC) re-publishes EndoTherm pilot at Vancouver International Airport

The Building Energy Innovators Council (BEIC) have recently re-published the case study of EndoTherm Pace Chemicals ran at Vancouver Airport. The BEIC was founded in 2016 by a diverse...

Case Study Spotlight: Multivesco

This weeks case study spotlight focuses on the recent success of real estate development company; Multivesco. The proof of concept EndoTherm pilot, run at their head office (200 Rue...

Adey Confirm Compatibility between EndoTherm and MC1 Protector Range

EndoTherm has today confirmed compatibility with Adey's leading line of corrosion inhibitors MC1 Protector and MC1+ Protector. This follows similar approvals from Sentinel and...